Skip to main content

Renovation programme

A "moviment" for tomorrow

Thanks to the support of the Ministry for Culture, it was decided in 2020 to conduct a programme of technical works. This will notably allow for the renovation and removal of asbestos from all facades, enhanced fire safety, improved accessibility for people with reduced mobility, and optimised energy efficiency for the whole building.
This important project necessitates the complete closure of the building. It also presents an opportunity to create a new large-scale cultural project for the Centre Pompidou, which should be operational in 2030.

Le programme technique

Les travaux répondent à des enjeux à la fois techniques, de sécurité, de développement durable et d’image, liés à la vétusté des ouvrages et aux exigences actuelles des normes environnementales, sanitaires et énergétiques.

 

  • La fiabilisation des installations :
    • Désamiantage total de la façade et changement de l’ensemble des baies vitrées. 
    • Traitement des corrosions de la structure principale et des ouvrages de serrurerie métallique. 
    • Réfection des peintures et des sols. 
    • Remplacement ou rénovation des ascenseurs, monte-charges et escaliers mécaniques du forum, remplacement des installations de courants forts en fin de vie ou détériorées et des installations de plomberie sanitaire. 
    • Reprise de l’architecture informatique et serveurs, modernisation des systèmes courants faibles, et des installations sûreté. 
  • La rénovation et l’optimisation énergétique :
    • Adaptation du niveau de traitement d’air par zone en fonction de leur usage, remplacement des boîtes de mélange (système de climatisation), et remplacement des centrales de traitement d’air en infrastructure. 
    • Rénovation des tours aéroréfrigérantes (traitement du risque légionellose). 
    • Remplacement des systèmes de courants faibles et la migration vers le tout IP… 
  • La mise en sécurité incendie et la mise en accessibilité :
    • Traitement de la stabilité au feu, remplacement des clapets coupe-feu et mise en conformité du désenfumage. 
    • Remplacement des peintures intumescentes. 
    • Réalisation des travaux d’accessibilité.

En septembre 2020, à l'issue d'une procédure de dialogue compétitif, l’équipe AIA Ingénierie / AIA Architectes / Peutz & Associés / Cosil Peutz Lighting design / Locomotion / Cabinet CDB a été retenue pour la mission de maitrise d’œuvre de l’opération du schéma directeur technique.


The project

Based on the notion of "moviment", a neologism created by Francis Ponge at the opening of the Centre Pompidou* in 1977, this cultural project aims to reinvent the original utopia of the Centre Pompidou while responding to the cultural, societal and environmental challenges of the coming years.

Among the foundations of the project:

 

  • Multidisciplinary actions
    Crossing the boundaries between disciplines has characterised the artistic singularity and DNA of the Centre Pompidou since its creation. The Centre Pompidou aims to continue to reflect and support contemporary creation as it engages with societal issues.
  • Hospitality at heart
    Designed from its inception as a space that is open and receptive to the city and its residents, the Centre Pompidou brings together and welcomes all practices, all forms of curiosity and creative aspiration. Marked by sincere hospitality, ever more welcoming, committed and responsive, the building will constitute a new address for visitors, passers-by and tourists.
  • An experimental factory for youth
    With the creation of a vast experimental section for youth, the Centre Pompidou undertakes to nurture and cultivate the free and lively conversation it wishes to have with tomorrow's generations.
  • Eco-responsibility, the core of the project
    By remaining in the current shell of the building, without any additional constructions or extensions, the Centre Pompidou opts for eco-responsibility. The transformation of some of its spaces will be based on the goal of effective resource management.

In the heart of Paris, a heart, a muscle, a pump breathing in and out in continuous beats, endlessly kindling, regularly and occasionally less regularly, moments of emotion and fever; a body in the shape of a hexagon, and further off, other bodies touching this one...and further away still, from touch to touch... I could go on forever; this is what should be, would be, will be and already is the Beaubourg building. Not so much a monument, more, to invent a word, a moviment.

 

*Francis Ponge, L’Écrit Beaubourg, Paris, Editions of the Centre Georges-Pompidou, 1977


Un avis de concours d’architecture pour la maîtrise d'œuvre du volet culturel des travaux a été publié le 15 mai 2023 en collaboration avec l’Opérateur du patrimoine et des projets immobiliers pour la culture (Oppic). Plus de quatre-vingts candidatures ont été reçues.

 

Le jury du concours s’est réuni le 27 juillet 2023 pour sélectionner six équipes. Présidé par Laurent Le Bon, il était composé de représentants du ministère de la Culture, de l'Oppic, de la mairie de Paris et du Centre Pompidou ainsi que de personnalités qualifiées. 

Les six équipes sélectionnées sont :

  • Aires Mateus associé à Nomade Architectes ;
  • Encore Heureux Architectes associé à AIA Architectes ;
  • Kuehn Malvezzi associé à Carrière Didier Gazeau et Calq ;
  • Lacaton & Vassal Architectes associé à Frédéric Druot Architecture ;
  • Moreau Kusunoki associé à Frida Escobedo Studio ;
  • Perrault Architecture associé à Gaëlle Lauriot-Prevost.

Le lauréat a été désigné en juin 2024.

Découvrez le projet lauréat


Le schéma directeur culturel qui se déroulera en articulation avec le schéma directeur technique, a pour principaux objectifs de réorganiser les différentes fonctions de manière plus rationnelle et plus lisible au sein du bâtiment et repenser les usages pour mieux correspondre aux besoins des usagers et des utilisateurs, dans une logique de « maîtrise d’usage ».


Provisional calendar of works

 Autumn 2024 Progressive closure of some spaces
Beginning of removals
 Summer 2025 

Building closed to the public

Continuation of removals

 December 2025 Complete closure of the building
 April 2026 Beginning of works
 2030 Reopening of the Centre Pompidou and the Bpi

 


During the closure

La période de fermeture du bâtiment pendant cinq ans est quant à elle l'occasion de faire rayonner l'état d'esprit et l'énergie du Centre Pompidou au-delà du plateau Beaubourg, grâce à la circulation de ses œuvres et de sa programmation culturelle à Paris, en France et à l'international. Centre Pompidou | Constellation sera l'incarnation, jusqu'à la réouverture de 2030, d'un Centre en mouvement, au service des publics et des artistes

 

Consultez la programmation 2025-2030